Key takeaways
- Built in, free with Power Apps
- Day, week and month views of a table’s rows
- Replaces the list in every view of that table
- Not supported in mobile offline
Pricing at a glance
| Product | Price |
|---|---|
| Power Apps calendar control | Included with Power Apps. |
Who it is for
Model-driven apps where people only need to see and add rows by day, week or month, with no lanes and nothing to check.
What it does
The board
A maker adds the control to a table’s view and picks the start, end, description and duration columns. It then replaces the list in every view of that table, showing rows by day, week or month. People create a row by dragging across time slots.
| Feature | Power Apps calendar control |
|---|---|
| Any Dataverse table with a start and an end | YesActivity tables show more detail |
| Each drag saved to the row | Not described |
| A lane per person or resource | Not described |
| Work waiting to be scheduled | Not described |
| Drag to move and resize | Not describedDragging creates a row |
| Move many at once, undo and redo | Not described |
| Layouts | YesDay, week and month |
Checks and Auto Schedule
Microsoft’s pages describe no conflict checks and no automatic scheduling.
| Feature | Power Apps calendar control |
|---|---|
| Checks on every drop | Not described |
| Automatic scheduling | Not described |
| Large boards | Not described |
Setup and platform
It is built in: a system customizer or administrator adds it in the view designer. It works on phones, though not in mobile offline.
| Feature | Power Apps calendar control |
|---|---|
| Install | YesBuilt in; a customizer adds it to a view |
| Set up by your AI agent | Not described |
| Runs in model-driven apps | YesReplaces the table’s list view |
| Security roles apply | Not described |
| Languages | Not described |
| Outlook and Google calendar sync | Not described |
Yes means the vendor’s own documentation describes the feature. A dash means it does not.
Strengths and limitations
Strengths
- Nothing to install: a customizer adds it in the view designer
- Works on any table with start and end columns
- A phone layout with a day bar to scroll
- Create a row by dragging across time slots
Limitations
- No lanes per person in Microsoft’s pages
- No checks on a drop and no automatic scheduling
- Replaces the list in every view of the table
- Not supported in mobile offline
Compared with Chrona Scheduler
The rows where they differ most. The full comparison has every row.
| Feature | Power Apps calendar control | Chrona Scheduler |
|---|---|---|
| A lane per person or resource | Not described | YesBind a lookup to the person or asset |
| Each drag saved to the row | Not described | YesStart, end and lookup, as you drag |
| Drag to move and resize | Not describedDragging creates a row | YesSnaps to your time scale |
| Work waiting to be scheduled | Not described | YesDrop open work on a person |
| Checks on every drop | Not described | YesDouble bookings, hours, skills, leave |
| Automatic scheduling | Not described | YesA constraint solver; three runs a day free |
Questions
Is the calendar control free?
Yes. It is part of Power Apps, and a system customizer or administrator adds it to a table’s view.
Can the calendar control show a lane per person?
Microsoft’s pages describe day, week and month views of a table’s rows, not lanes per person.
Does the calendar control work offline?
Microsoft says the calendar control is not supported in mobile offline.
How we compared
We build Chrona, so read this review with that in mind. Its facts come only from the vendor’s public pages, listed below. We have not tested or scored the product. If something here is out of date, tell us and we will correct it. Tell us
