General information only. This explains a scheduling term. It is not legal advice: the rules that bind you come from the law, your agreements and your contracts.
Understanding lanes
A lane is the line a resource works along. Looking along it shows how busy that resource is.
What a lane shows
- The resource’s name and group.
- Its work as bars over time.
- Hours against its limit.
What a drop checks
- Two pieces of work at the same time.
- Work outside the working hours.
- A missing role, or booked leave.
Common mistakes
- Too many lanes to read without groups.
- Lanes for resources that no longer work.
- Ignoring a warning on a drop.
How Chrona does it
With Resource bound, the board shows one lane for each worker or asset, grouped under the Group and Subgroup columns.
Each drop is checked: two rows on one worker at the same time, a row outside working hours, a worker without the role, or a row over booked leave. Each check is off, warn or block.
Step by step in the docs
Lanes
Bind Resource to show one lane per resource.
The scheduler row
Set the group columns and each drop policy.
Key takeaways
- A lane holds one resource’s work over time.
- Lanes can be grouped by team or site.
- In Chrona, each drop on a lane is checked.
Questions
Can lanes be grouped?
Yes. In Chrona, by the Group and Subgroup columns.
What does warn do?
In Chrona, the row lands with a note.
What does block do?
In Chrona, the row snaps back with the reason.
Does Auto Schedule use the drop rules?
No. It checks its proposal as a whole; the drop rules check your own moves.
Related terms
This is a Chrona word.
