# Layouts

> **Set up with an AI agent:** Connect Chrona MCP for documentation, setup guidance and configuration recipes. Server: https://mcp.chrona365.com/mcp (Streamable HTTP; authentication: None). Your agent needs separately authorized Dataverse tools to apply changes. In Copilot Studio, after importing Chrona, add the Chrona Scheduler connector to your agent alongside Microsoft’s Dataverse tools. [Connection guide](https://chrona365.com/install-with-an-agent).

The scheduler draws a view in one of four layouts. The maker picks the layout once, on the view's configuration row (**Layout** on the Chrona Scheduler View row, see [Where things are set up](https://chrona365.com/docs/scheduler/configure)); the people using the view do not switch it. What they do choose, per person, is the interval: Day, Week, Work week or Month, and the rest of the toolbar's settings.

Every layout shows the same rows: the shifts, jobs or visits of the bound view, drag-and-drop scheduling, the right-click menu, the unscheduled panel, and the collision checks. The colors in the pictures come from the view row's **Color by** setting, here set to Role: a bar takes its role's color; Group and Status are the other choices, and nothing leaves the bars neutral.

| Layout | What it draws | Pick it when |
| --- | --- | --- |
| Timeline | One lane per person or asset, time across, bars for the rows. The default, and the only layout with the coverage strip and the roster periods. | Planning against people or assets: who is on, who is free, where the gaps are. |
| Roster grid | One row per person, one column per day, each shift as a chip on the day it starts; an item longer than a day shows on each day it covers. Shifts nobody works sit in the **Open shifts** row above the people: drag one onto a person to assign it, or a person's shift onto the row to take them off. With Chrona Workforce Scheduler, people sit in groups by their first role, and each group has its own **Open shifts** row and a **Filled / needed** row that counts each day's shifts. With a **Period** on the view row, it shows the whole period, and Previous and Next move a period at a time. | The classic roster sheet: a week or a fortnight at a glance, printed or on a wall screen. |
| Top-down | One column per person, time down the page, bars with their length. | A day at a time, when the length of each shift matters more than the week. |
| Agenda | The rows as a list by day, with the time, the title and the person. | A phone, a narrow pane, or reading the plan rather than moving it. |

Without a Resource lookup bound there are no people or assets, so the timeline layout shows the day, week or month calendar instead.

## Timeline

![The timeline layout: a lane per person, bars for the shifts, the unscheduled panel on the right](https://chrona365.com/docs/images/layout-timeline.png)

## Roster grid

![The roster grid layout: a row per person, a column per day, a chip per shift](https://chrona365.com/docs/images/layout-roster.png)

To add an item, double-click a day's empty space, or select **+** in the corner of a day with no item. The **New item** dialog opens with the row's person (on the **Open shifts** row, nobody) and the whole day, from midnight to midnight; set the times, then select **Save**. A day that already has an item takes another.

From the keyboard, the grid is one tab stop. The arrow keys move between the days, and **Down** goes through a day's items before the day below. **Home** and **End** go to the row's first and last day, and **Ctrl+Home** and **Ctrl+End** to the grid's first and last day. **Enter** on a day opens **New item** for it, and **Enter** on an item opens it. **Shift+F10** opens an item's menu. **Tab** leaves the grid, and coming back returns to the day or item you left.

## Top-down

![The top-down layout: a column per person, the hours down the page, bars with their length](https://chrona365.com/docs/images/layout-topdown.png)

## Agenda

![The agenda layout: the shifts listed by day with time, title and person](https://chrona365.com/docs/images/layout-agenda.png)

## Setting the layout

1. Open the Chrona Scheduler View row for the view (the row whose Bound view is the view's id; Connect creates it).
2. Set **Layout** to Timeline, Roster grid, Top-down or Agenda. Empty means Timeline.
3. Save. The next load of the view draws it that way for everyone.

The time scale (Slot length), the working hours and the weekend default on the same row apply to every layout that draws a time axis.

---
Product: Free Scheduler
Language: English
Canonical: https://chrona365.com/docs/scheduler/layouts
